
Moon Hotel -> The Intergalactic Construction Company of Earth
Your product will land on the Moon next year.
You’ll design, build, and test our 2027 Lunar Payload: the one that manufactures humanity’s first bricks on the Moon and deploys an inflatable habitat bladder. This is hands-on, full-lifecycle hardware engineering at a pace most aerospace companies can’t keep up with.
What you’ll do:
What we’re looking for:
If you want to maximize the probability that humanity becomes interplanetary in your lifetime, apply and share a portfolio of the technical work you’re most proud of.
1. Intro call
2. Take-home challenge (24 hours)
3. Onsite in SF
4. Offer
GRU builds off-world habitats using in-situ resource utilization technology, turning local material into building material.
We are landing on the Moon in 2027: our first mission will turn lunar regolith into bricks and demonstrate our modular pressurized habitat system. A second mission will begin laying the hotel’s foundation in a lunar cave. A third mission will open the first lunar hotel, targeted 2032.
We don’t stop at Moon hotels. GRU’s long-term plan:
GRU Space is backed by investors in SpaceX + Anduril, and is part of Nvidia’s Inception program.